Jobs & Education1 min ago
Diy
2 Answers
My central heating system incorporates a CONDENSATE SOAKWAY DRAIN. It's about 5 inches in diameter, 15 inches in depth and has a rubber capping with a central bung.
The systam shuts down and error code EA is displayed. I think the soakaway has become gummed-up (the system has be installed about 30 months) because when the central bung is removed water rises up and spills over the surface block paving (about a small cupful) and the system can be started up agan ok - but only for a day or so when I repeat the bung removal again and so on.
QUESTIONS How is the rubber capping removed - yanked up or unscrewed ? and how easy is it the remove the limestone chippings?? I would propose to replace the chippings with a new fresh lot.
Comments and remarks wouod be gratefully received.
The systam shuts down and error code EA is displayed. I think the soakaway has become gummed-up (the system has be installed about 30 months) because when the central bung is removed water rises up and spills over the surface block paving (about a small cupful) and the system can be started up agan ok - but only for a day or so when I repeat the bung removal again and so on.
QUESTIONS How is the rubber capping removed - yanked up or unscrewed ? and how easy is it the remove the limestone chippings?? I would propose to replace the chippings with a new fresh lot.
Comments and remarks wouod be gratefully received.
Answers
Best Answer
No best answer has yet been selected by guitarboogie. Once a best answer has been selected, it will be shown here.
For more on marking an answer as the "Best Answer", please visit our FAQ.Kind thanks to The Builder who quite rightly thought the rubber capping was a large push-in fitting. It came out nice a cleanly with only a small effort - I used a large screwdriver to prise up the capping at one side and the whole thing just "popped out"
The job of removing the limestone chippings was very straightforward if rather tedious - a desert spoonful at a time and it took me about 40 minutes.
Again - thanks to The Builder.
The job of removing the limestone chippings was very straightforward if rather tedious - a desert spoonful at a time and it took me about 40 minutes.
Again - thanks to The Builder.