Home & Garden8 mins ago
How Deep ?
3 Answers
Four small boundary posts that divide the front gardens of neighbours and mine are rotten.
Solution is to dig them out and replace with same (3 x 3 treated timber).
They are only 15" above ground level - how deep in post-crete do they need to be below the surface to make them stable ?
Solution is to dig them out and replace with same (3 x 3 treated timber).
They are only 15" above ground level - how deep in post-crete do they need to be below the surface to make them stable ?
Answers
Best Answer
No best answer has yet been selected by woodchopper. Once a best answer has been selected, it will be shown here.
For more on marking an answer as the "Best Answer", please visit our FAQ.