Question Author
i have 1 page with header on it, plus boxes covering hole page.
i need to put the dates for one year down the left in the first row of boxes in weekly form, so how do i get, say 4 weeks onto 12-13 sheets covering the year. the header needs to be on all pages along with the boxes.
i know how to get all the dates, its just i want to put the first week in, and a space at the bottom to total things, then drag down, filling the first page (say with 4 weeks).
i do that, but thought there must be a way to continue with the dates to run onto the other 12 sheets with the headers and boxes.
i know its an idiots guide i normally need.
thank you.