Film, Media & TV6 mins ago
concrete mixing
4 Answers
With regard to 6 to 1 mix Does it mean one part by volume of cement to one part of ballast by volume to 4 parts of sand by volume. mixing together ?? So If I buy one bag of cement I will need to buy one bag of ballast and 4 bags of sand. Any advice will be very much appreciated.
Answers
Best Answer
No best answer has yet been selected by novicediy. Once a best answer has been selected, it will be shown here.
For more on marking an answer as the "Best Answer", please visit our FAQ.I wouldn't lose too much sleep over it. 1:6 is fairly weak, some applications are as low as 1:4; its the amount of water you add that is more crucial. Too much water will result in very weak concrete as what is unused in the cement reaction just takes up space and when it finally drains/evaporates that's empty space. Apparently its only about 1/2 to 2/3 of the water you add that is really needed to set the concrete, the rest is to make it workable so jsut watch for that.
Usually the proportions of all three components (cement:sand:ballast [ which I think is coarse aggregate in American usage]) must be mentioned to describe a concrete mix. The most common for building purposes is 1:2:4, 1 being cement, 2 sand and 4 aggregate, and which yields a cylinder strength of at least 3000 psi.
If no other information is available 1 to 6 concrete can be taken to be 1:2:4. Remember, sand is a must in any concrete mix.