The survey on a 3-BR end of terrace house we may be purchasing turned up several possible problems and I need to know about what the repairs would cost for:
replacing/repairing render, replacing cavity wall ties, ventilating sub-flooring, removing ceiling polystyrene.
Gravatar

Answers

1 to 7 of 7rss feed

Best Answer

No best answer has yet been selected by warybuyer. Once a best answer has been selected, it will be shown here.

For more on marking an answer as the "Best Answer", please visit our FAQ.
well get some quotes then!
As the above says in few words, its beyond the scope of a website to estimate this for you, however problems 2 and 3 listed above do not sound like good news at all, and I would seriously question if this house is worth continuing with purchasing. Why buy into a problem property? You are well into � four figures here.
As buildersmate says, the wall ties and the flooring could really cost, so unless the house is a real snip, serious thinking needed, good luck, Ray
Why would you be paying for these jobs? If you are buying then the seller should make the (certainly 1 and 2) arrangements to have this work put right. I sold a terrace house last year and had the cavity wall ties done, cost about �300.
Must have been just a few ties then. You have to take an outside brick out to do each one.
Question Author
Inspecting sub floors and drilling holes in walls is not what most sellers want you to do if there is a chance you are going to back out anyway. The procedures are quite intrusive. Furthermore, these inspections can be quite costly in themselves.

So I was looking for some general idea of what it would cost for making good these items in the worst case scenario. Then I could approach the vendor and try and renegotiate. If he won't, then the solution is simple. Trying to find out an example cost for rerendering an average 3 Bed semi is like pulling teeth. I have gotten ball park estimates for the cavity wall ties of �1200 - �2000. Again, worst case scenario.
Question Author
I might add, that if he agrees to renegotiate, then I will order the necessary inspections as suggested by my surveyor. It is only a �185000 house.