Quizzes & Puzzles3 mins ago
Block paving
3 Answers
How deep should I excavate before layibg block paving.
Answers
Best Answer
No best answer has yet been selected by oops!!!. Once a best answer has been selected, it will be shown here.
For more on marking an answer as the "Best Answer", please visit our FAQ.As an absolute minimum, you should allow for 25mm of sand to bed the blocks on and 150mm of well compacted Type 1 under that. This assumes that the formation level (the level you are at when you have dug out the 250mm) is solid and not cr@p. Laying the blocks is the (relatively) easy bit. Do not skimp on the preperation. Oh, and lay some Terram or similar on the formation before laying your Type 1.